To renovate in Tenerife you need a prior notification (comunicación previa) or a minor works permit (obra menor) if you don’t touch the structure, the layout or the façade – which covers most kitchen, bathroom, flooring or plumbing and electrics renovations – and a major works permit (obra mayor) with an architect’s project, stamped by the professional body (proyecto técnico visado) if you change the layout, work on structural elements or alter the building envelope. The main cost is the ICIO (municipal construction tax), around 3–4% of the cost of the works, plus the municipal fee. Minor works are resolved within weeks; major works can take months.
It’s the procedure people skip most often and the one that causes the most grief later. Not because the town hall is watching every flat, but because it surfaces when it’s least convenient: when you sell the home, apply for a mortgage, make an insurance claim or when a neighbour files a complaint. This guide sets out what applies to you depending on what you plan to do.
The criteria and the exact fees depend on each town hall’s by-laws (ordenanzas) and change over time. This guide explains how the system works in general; the exact procedure and its cost should always be confirmed with the town hall of your municipality before you start. This is not legal advice.
Prior notification, minor works and major works
There are three regimes, from least to most demanding:
Prior notification (comunicación previa, or declaración responsable)
You notify the town hall that you’re going to carry out works that don’t require prior authorisation, pay the fee and can start. This is the regime for the lightest renovations: painting, replacing flooring, changing sanitaryware or kitchen units without touching the main plumbing and electrical systems.
Minor works (obra menor)
Works that don’t affect the structure, the exterior appearance or the overall layout of the home, but do involve building work and renewing the plumbing and electrics. This is the procedure for most complete bathroom and kitchen renovations, and for full renovations that keep the original layout.
Major works (obra mayor)
Requires a technical project drawn up by a qualified professional and stamped by their professional body, and site supervision by an architect or engineer (dirección facultativa) during the works. It’s mandatory when you work on the structure (beams, pillars, floor slabs), when you change the layout by knocking down or putting up partition walls, when you change the façade or the windows and external doors in a way that alters the look of the building, or when you change the use of the property.
Which procedure applies to each renovation
| What you want to do | Usual procedure | Technical project? |
|---|---|---|
| Painting and replacing floors | Prior notification | No |
| Replacing a bath with a shower | Prior notification or minor works | No |
| Complete bathroom renovation | Minor works | No |
| Complete kitchen renovation | Minor works | No |
| Renewing plumbing and electrics | Minor works | No (but you do need the electrical installation certificate, the boletín) |
| Full renovation without changing the layout | Minor works | Usually not |
| Knocking down partition walls or joining rooms | Major works | Yes |
| Making an opening in a load-bearing wall | Major works | Yes, with structural calculations |
| Changing windows in a way that alters the façade | Major works | Yes |
| Enclosing a terrace | Major works | Yes |
Two warnings that are often overlooked. First: if the building is in a protected historic area (conjunto histórico) – La Laguna’s historic centre, for example, or certain parts of Santa Cruz, La Orotava or Garachico – almost any work that can be seen from the street needs an additional report, and the criteria are considerably stricter. Second: in a community of owners (comunidad de propietarios), work on common elements (soil stacks, façade, terraces) also needs the community’s approval, which is a separate permission, independent of the town hall’s.
If you are renovating an old single-storey house (casa terrera), our guide to renovating a traditional house in Tenerife also covers the flat roof, damp and the installations.
How much the permit costs
The cost has two or three components:
- ICIO (tax on construction, installations and works): around 3–4% of the material cost of the works (presupuesto de ejecución material), depending on the rate approved by each municipality.
- Permit processing fee: a smaller percentage or a fixed amount, depending on the by-law.
- Technical project and site supervision (major works only): fees for an architect or technical architect (arquitecto técnico), which depend on how complex the job is.
As an order of magnitude: on a renovation with a material cost of €30,000, the municipal part comes to around €900–€1,200 in ICIO plus the corresponding fee. For major works you have to add the professional fees, which are the really significant item.
How long it takes to be granted
Prior notification lets you start as soon as it has been submitted and the fee paid. Minor works that need authorisation are usually resolved within weeks. Major works are another world: between drawing up the project, having it stamped and the town hall’s decision, it can take several months.
The practical consequence is about scheduling, not money: if your renovation involves changing the layout, the procedure has to be started before you agree dates with anyone. It’s the most common reason a job starts two months later than the owner had in mind.
What documents you need to submit
For minor works or prior notification, the usual documents are:
- The application form of the relevant town hall.
- A detailed quote for the works, showing the material cost of the works.
- A written description of the works (memoria descriptiva) and, if requested, sketches of the current and renovated layout.
- Proof of payment of the fees and ICIO.
- A document proving that you own the property.
For major works you also need:
- A technical project drawn up by a qualified professional and stamped by their professional body.
- The form appointing the site supervision team.
- A basic health and safety study.
- A construction waste management study.
What happens if you renovate without a permit
The consequences don’t usually arrive during the works but afterwards, and that’s why the risk is underestimated:
- A stop-work order and enforcement proceedings if the town hall finds out about the works, usually through a complaint from a neighbour or the community of owners.
- A fine, calculated on the cost of the works carried out.
- An obligation to legalise the works retrospectively, which almost always costs more than applying in time. And if what has been built can’t be legalised – because it doesn’t comply with the regulations – the order may be to demolish it.
- Problems when you sell. Undeclared works that change the floor area or layout compared with the Land Registry record complicate the title deed and can sink the valuation for the buyer’s mortgage.
- Insurance cover. If there’s a claim related to the works – a leak, an electrical fire – work done without a permit and without a boletín gives the insurer a solid argument for not paying out.
In our full home renovation quotes, the permit is included as a line item of its own and we handle the application, with the fees itemised so you can see what goes to the town hall and what goes to the company. If you want to know which procedure applies to you, tell us on the site visit: ask for your quote and we’ll check it before giving you a start date. And if you’re comparing companies, the guide on how to choose a renovation company includes the specific questions worth asking on this point.
Frequently asked questions
Not sure which one applies to you? The building permit assistant tells you in five questions, and flags whether your municipality has a protected historic centre.
Do I need a permit to renovate a bathroom or a kitchen?
Yes, although it’s usually the simplest procedure: prior notification (comunicación previa) or minor works (obra menor), depending on the town hall. That’s enough as long as you don’t touch the structure, change the overall layout of the home or alter the façade. If you take the opportunity to knock down a partition wall or move the soil stack, the procedure may move up a category.
How much does a building permit cost in Tenerife?
The municipal construction tax (ICIO) is around 3–4% of the cost of the works, plus the municipal processing fee. On a €30,000 renovation that comes to roughly €900–€1,200 in ICIO plus the fee. For major works (obra mayor) you also have to add the technical project and site supervision.
How long does it take for the permit to be granted?
Prior notification (comunicación previa) lets you start practically straight away once it has been submitted and the fee paid. Minor works are usually resolved within weeks. Major works with a project can take several months, and that time has to be built into the renovation schedule from the start.
Can I start the works while I wait for the permit?
With prior notification, yes: that’s precisely how it works. With minor works that need authorisation, and with major works, no. Starting early exposes you to the application being halted and to a penalty, and the time saved is never worth it.
Who applies for the permit, me or the renovation company?
Either of you can: the permit is always in the owner’s name, but the application can be delegated. In our quotes, handling the permit is included as a line item of its own, with the fees itemised so you can see exactly what is paid to the town hall and what is paid to us.