Swimming pool construction and renovation in Tenerife
A pool in Tenerife is used almost all year round, which puts it through more of everything: more hours of sun on the pool shell, more evaporation and, on the coast, salt air on every metal part. The two things that decide whether it will cause you headaches are how watertight the shell is and how the water treatment is set up.
Free site visit and quote anywhere on the island. Reply within 24 working hours, in English.
With a pool, the money is decided in two places: the shell and the plant room. A well-built shell, with its concrete, its waterproofing and its wall penetrations properly detailed, doesn’t lose water and lasts for decades. A properly sized plant room, with the pump and filter matched to the actual volume, keeps the water in good condition without you having to keep a constant eye on it.
What you see, the lining and the coping, comes last and is the easiest to change. What you don’t see is what you won’t be able to fix without emptying the pool and breaking it open. So if you have to cut back somewhere, it’s never on the waterproofing or the hydraulic installation.
What this service includes
- Preliminary study of the plot. Where the pool can go given the setbacks and planning rules, how machinery will get in, and where the plant room will go, which needs to be close by and accessible.
- Earthworks and building the shell. Excavation, the pool structure and waterproofing, with particular care over the pipe penetrations, which are where most problem pools lose water.
- Hydraulic installation and plant room. Skimmers or an overflow channel, return inlets, main drain, pump, filter and valves, sized for the real volume of the pool and not for the catalogue.
- Water treatment system. Salt chlorination or chemical dosing depending on how you’ll use the pool and who will look after it, with the pros and cons of each option explained before you decide.
- Lining, coping and pool surround. With non-slip material around the edge, which is where slips happen, and a properly finished perimeter joint.
- Renovating existing pools. Relining, leak repairs, renewing the filtration and switching to easier treatment systems.
- Commissioning and a maintenance walkthrough. We show you how to run your installation, because a well-built pool that’s poorly maintained ends up causing the same problems as a badly built one.
What is NOT included
This list matters as much as the first one, and hardly anyone publishes it. Any of these items can be added to the quote: what we don’t want is for them to turn up halfway through the job as a surprise.
- Routine water maintenance and consumable chemicals, which are an ongoing service and contracted separately.
- Fencing or the child safety systems required for shared-use pools, which are quoted as their own line item.
- Legalisation and health requirements for a shared-use pool, such as one belonging to a community of owners or a holiday complex, which follow their own regulations.
- Gardening, perimeter landscaping and decorative lighting around the pool, unless expressly included.
- Extra costs from ground that turns out different from what was expected, such as unforeseen rock or fill that forces a change to the pool’s foundations.
- Municipal permit fees and taxes, which are paid by the owner.
How much it costs in Tenerife
We don’t publish a fixed pool price because there are too many variables for a single figure to mean anything: the same pool on two different plots can produce very different quotes. What we can do is show you how it’s calculated.
- It starts from the volume and shape of the pool. The water surface area drives the lining, but depth and shape drive the excavation and the structure, which is where the money is.
- We assess the ground and the access. Digging into rock costs considerably more than into soil, and a plot that a machine can’t get into calls for solutions that multiply the hours.
- We define the type of shell: sprayed concrete, blockwork or traditional construction. Each has its cost and its timescale, and the choice depends on the ground and the shape you want.
- We size the hydraulic installation: number of skimmers or a perimeter overflow channel, pump power, filter type and plant room. An undersized pool is paid for later in pump hours and water problems.
- We choose the treatment system. Salt chlorination is easier day to day and costs more up front; traditional dosing is cheaper to install and more demanding to maintain.
- We add the lining, coping and surround, the most visible and most flexible line item: this is where you decide how much to spend without compromising anything above.
All these items are pinned down in the quote after visiting the plot, and until then any figure is a guide. In the Canary Islands IGIC, the local indirect tax, is charged instead of VAT, always shown as a separate line.
Timeframes
6–12 weeks
Building a new pool usually takes between a month and a half and three months, depending on the type of shell and how much the ground complicates things. A good part of that time is technical waiting that can’t be compressed: concrete cures at its own pace and the waterproofing needs its time before the lining goes on. Renovating an existing pool, on the other hand, is much quicker if the shell is sound and only the lining and filtration need renewing. On top of this comes the council approval beforehand, and how long that takes depends on the town hall.
How we work
We manage the works, and they are carried out by professional tradespeople from the island, chosen by us for each line item. We don’t have a crew on the payroll and would rather say so up front: you sign one contract, speak to one person and we answer for the whole job. We explain it plainly in about us.
- Site visitWe come to the property, measure up and check the plumbing and electrics. Free.
- Fixed-price quoteWithin 3–5 days: every line item with price, finishes and timeframe.
- Permit and scheduleWe handle the permit and line up the trades with no dead time.
- Supervised worksProgress updates with photos. Any change is approved before it is made.
- HandoverFinal walk-through with you and a closed snagging list.
Salt, sun and evaporation: what the island does to a pool
Pools in Tenerife work harder than almost anywhere else in Spain, simply because they’re used for more months of the year. That has practical consequences that are best planned for in the project rather than discovered later.
- Evaporation is high for much of the year, so topping up is constant and a pool cover or thermal blanket pays for itself faster than you’d think.
- Direct sun speeds up disinfectant consumption and punishes any strongly coloured lining, which fades sooner than the catalogue promises.
- On the seafront, salt air attacks screws, ladders and grilles: if they aren’t made of the right material, within a few years they need replacing.
- Salt chlorination is very convenient, but salt water is aggressive towards nearby metals, so the materials have to be chosen with that in mind from the start.
- Heavy, concentrated rainfall means thinking about how the surround drains, so the pool doesn’t collect all the runoff from the plot.
Renovating a pool that’s losing water
When a pool’s level drops more than evaporation can explain, there’s a leak, and the first step is to find it before quoting anything. Leaks are usually at the pipe penetrations, the skimmers, the valves in the plant room or a crack in the shell, and each one is repaired in a very different way.
What makes no sense is relining without having found the leak: it’s the expensive renovation that’s back where it started six months later. First you find it, then you decide, and the diagnosis is an honest line item that we’d rather charge separately than bury inside works that may not be needed.
Where we offer this service
Across the whole island of Tenerife. Our office is in Arona, and we work in all four areas: the metropolitan area, the north, the south and the Güímar Valley. The site visit is free in every municipality.
Frequently asked questions
The questions we are asked most often on site visits. If yours is not here, ask us directly.
Do I need a permit to build a pool?
Yes. A pool is a construction that occupies land and alters the plot, and every town hall on the island requires an application for it, usually with technical documentation. You also have to check the setbacks from the boundaries and whether the planning rules allow the location you have in mind. It’s the first thing we look at, before talking about shells or linings.
Salt or chlorine?
Salt chlorination generates the disinfectant from salt and makes day-to-day life much easier, with water that’s kinder to the skin. On the other hand, the equipment costs more up front, the cell has to be replaced over time and salt water means taking care of the surrounding materials. If the pool is going to be looked after regularly by someone who knows what they’re doing, traditional dosing is still perfectly valid and cheaper to install.
Can I convert my pool from chlorine to salt?
Usually yes, and it’s one of the most requested renovations. You need to check that the hydraulic installation can take it and, above all, check the metal parts in contact with the water and around it, because not all of them cope well with salt water. It’s checked before committing to anything.
How much does it cost to maintain a pool in Tenerife?
It depends on the volume, the treatment system and how many months a year you use it, which here is usually almost all of them. We won’t give you a made-up monthly figure; what we do is explain, with your specific installation, what the pump uses, how often chemicals need replenishing and what maintenance each component needs.
Can you renovate just the filtration without touching the shell?
Yes, and it’s very common: pools in good condition with outdated plant rooms that use too much power and filter poorly. The pump, filter and valves are renewed, the pipework layout is checked and the plant room is left tidy and accessible. It’s usually the job with the best ratio between what it costs and what it improves.
Related services
Terrace and roof terrace renovation
Renovating a terrace or roof terrace in Tenerife so the damp doesn’t come back: waterproofing, falls, flooring and railings that stand up to salt air.
View the service
House and villa renovation
What it costs to renovate a house or villa in Tenerife, what the quote covers and what it doesn’t, and how the works are run so they stay under control.
View the service
Roof and flat roof waterproofing
Roof waterproofing in Tenerife: we find where the leak really comes from before quoting, and repair to suit the roof. We speak English.
View the service
Tell us what you need
We call you within 24 working hours, in English, to arrange the visit. Free and with no commitment.
- Free site visit anywhere on the island
- Fixed-price quote, itemised line by line
- Your details are not passed on to third parties
Prefer to talk? +34 822 263 441
Shall we put a price on your renovation?
Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.