Get three quotes based on the same written scope and compare them line by line, not by the total. Before you sign, check that the company is properly registered and up to date with its obligations, that it has valid public liability insurance, that the quote specifies finishes by brand and model (not ‘top quality’), that it includes the permit, rubble removal and a timeframe in writing, and that payment is linked to milestones in the works rather than made up front. The most reliable warning sign isn’t a high price: it’s a one-line quote.
A renovation is one of the biggest spending decisions most people make in a lifetime, and yet it’s often decided with less information than buying a car. The difference between a smooth job and an eight-month nightmare is almost never the price: it’s what was agreed in writing before work began.
The four types of company you’ll come across
In Tenerife, when you search for a ‘renovation company’ you’ll find four different models that aren’t competing on the same thing. It helps to know which one you’re talking to:
| Model | How it works | Pros | Watch out for |
|---|---|---|---|
| Lead portal | You fill in a form and they sell your details to several companies. | A quick way to get contacts. | Five companies call you, none of them takes responsibility for the whole job and your details get passed around. |
| Self-employed tradespeople | You hire the builder, the plumber and the electrician directly. | The lowest price per item. | You do the coordinating: if the tiler turns up before the plumber, it’s your problem. |
| Construction firm with its own crew | Staff on the payroll for most of the work. | Direct control over the main trades. | Less flexibility on scheduling and, for specialist items, they subcontract anyway. |
| Full renovation management | One company designs, quotes and coordinates the trades who carry out the work. | A single point of contact, one contract and one party answerable for the whole job. | Whether it’s transparent about who carries out each item and how it responds if a trade lets you down. |
None of them is inherently better. What is a bad sign is a company that can’t explain which of the four it is. We work in the fourth and say so openly in how we work: we don’t have our own crew, we select and coordinate tradespeople on the island, and we answer for the result ourselves.
The 12 questions to ask before you sign
- Who will carry out each item? If the answer is vague, that’s an organisational problem, not commercial discretion.
- Do you have valid public liability insurance? Ask to see the policy and this year’s receipt. If there’s damage to the flat below, it’s the only thing that protects you.
- Is the company up to date with the tax authorities (Hacienda) and Social Security? It’s a certificate issued the same day, and any serious company will show it to you without a problem.
- Who is my contact during the works, and how often do they visit the site? A specific name and a specific frequency.
- Is the quote fixed-price or cost-plus? Fixed-price means the price doesn’t change unless the scope does. Cost-plus (por administración) means you pay whatever it comes to.
- What exactly happens if something unexpected comes up? The right answer includes: work stops, it’s documented with photos, it’s quoted separately and nothing is done without your written approval.
- Are the permit and fees included? If not, add them to the total in your head before comparing.
- Is rubble removal to an authorised tip included? It’s a real line item that sometimes disappears from the quote and reappears on the invoice.
- What completion time do you commit to, and what happens if you miss it? A deadline with no consequence attached is an intention, not a commitment.
- How are the payments structured? A reasonable deposit and stage payments linked to completed milestones.
- Can I see finished jobs or speak to previous clients? A company with a track record will give you references; a newly created one will tell you so honestly, and that’s also useful information.
- What guarantee do you give in writing, and what does it cover? Make sure it’s in the contract, not just said out loud on the visit.
How to read a renovation quote
A useful quote can be checked line by line. It should include:
- Separate sections: demolition, plumbing and electrics, building work, kitchen, bathrooms, floors, joinery, painting, permits.
- Measurements: square metres of wall tiling, linear metres of skirting, number of light points. Without measurements there’s no way to check anything.
- Specific finishes: brand, model and size. ‘Top-quality porcelain tile’ means nothing; ‘60×60 porcelain tile from the X range’ does.
- Unit price and total per item.
- What is excluded, stated explicitly. A quote that lists what it does NOT include is a sign of professionalism, not stinginess.
- Completion time and payment terms.
- IGIC shown separately. In the Canary Islands the tax is IGIC (the Canary Islands’ indirect tax), not VAT (IVA): check that the rate applied is correct and that the total you’re comparing includes tax in all three quotes.
Rule of thumb: if the quote fits on half a page and ends in a single number, it isn’t a quote, it’s an estimate. You can’t compare it, you can’t hold anyone to it and it doesn’t protect either party.
Warning signs
- A price far below the others for the same scope. Items are almost always missing.
- A quote given over the phone without seeing the property. It’s a figure to hook you that will go up as soon as work starts.
- Demands for a large deposit, of 50% or more, before anyone has set foot on site.
- Pressure to sign and offers that are ‘only valid this week’. A renovation isn’t a clearance sale.
- A discount for paying without an invoice. You give up the guarantee, the tax deduction and any later claim. It’s never worth it.
- No physical address or tax details visible on the quote or the website.
- Reluctance to put the timeframe in writing.
- Photos of jobs that aren’t theirs. If the portfolio is catalogue images, ask about a real job you can visit.
How to compare three quotes that look nothing alike
The classic mistake is comparing totals. Three quotes rarely cover exactly the same thing, so the total tells you nothing. What works:
- Write the scope yourself first. A list of what you want done, room by room, given in exactly the same form to all three companies. That way you’re comparing answers to the same question.
- Draw up a table by section and put what each one offers on each line. The gaps are the valuable information.
- Convert to euros per m² to get a common reference against the market (the ranges are in the guide to renovation prices in Tenerife).
- Add in what’s missing. If one doesn’t include the permit and another does, add the permit to the first before comparing.
- Score what isn’t price: clarity of the document, how you were treated on the visit, verifiable references and timeframe. On a three-month job, this matters as much as the money.
What the contract must include
- Full tax identification of both parties.
- The detailed quote as an appendix, forming part of the contract.
- Total price including IGIC and a payment schedule linked to verifiable milestones.
- Start date, completion time and how delays are dealt with.
- A written procedure for changes and unforeseen work.
- A guarantee on the work carried out and details of the public liability insurance.
- Who applies for the permit and who pays the fees.
- Handover terms: final walk-through, snagging list and a deadline for completing it.
If you’re at this stage, the most useful thing you can do is have the scope written down before you call anyone. We prepare it with you on the site visit – it’s free – and hand it over in a comparable format even if you end up hiring another company: ask for your renovation quote. If what you have in mind is a full home renovation, also check which building permit you need: it affects the schedule more than anything else.
Frequently asked questions
How many quotes should I get?
Three. With two you have no market benchmark, and with five you freeze up and end up deciding on price, which is the worst possible criterion. Three comparable quotes, based on the same written scope, give you a realistic range.
Is it a bad sign if a company subcontracts?
Not in itself: practically all of them do for some items, because nobody has carpenters, plumbers, electricians and tilers on the payroll all at once. What is a bad sign is that they don’t tell you, or that they can’t tell you who will carry out each item. Ask directly how they are organised and who is answerable if a trade lets you down.
How much do you pay up front for a renovation?
What’s reasonable is a deposit of 20–30% on signing, to buy in materials, and the rest in stage payments linked to completed, verifiable milestones. Paying more than 50% before the works start means taking on a risk that shouldn’t be yours.
What guarantee does a renovation come with?
Spain’s Building Act (Ley de Ordenación de la Edificación) sets guarantees of three years for defects affecting habitability and one year for defects in the finishes; structural damage is covered for ten, although in a renovation with no structural work that tier rarely applies. Ask for it in writing in the contract and keep the invoices: without an invoice there’s no guarantee to claim on.
Is the cheapest company worth it?
Almost never, and not because of quality but because of arithmetic. If one quote is 30% below the other two for the same scope, it isn’t usually because it’s more efficient: it’s because items are missing that you’ll pay for anyway later on, in the form of ‘that wasn’t included’.