The Canary Islands’ Law 6/2025, in force since 13 December 2025 and amended in August 2026, sets technical minimums for a holiday rental (vivienda vacacional) that in many cases mean carrying out works: an energy rating of F or better (D if the building dates from after 2007), hot water from solar panels or another equivalent renewable source, and 35 m² of usable floor area, with a second complete bathroom if more than four guest places are advertised. If the property is under 35 m², the law accepts alternatives, such as an A or B energy rating. If your property was already registered, you have five years to carry on as before or to adapt. And if you choose to consolidate the tourist use, be careful: the law allows renovation (reforma), but not rehabilitation (rehabilitación).
Until now, renovating an apartment you let out was mostly about choosing finishes that could stand up to guest turnover. Since December 2025, the question to ask first is what works are needed so that the property can carry on being let. This guide summarises what the law says about the property itself and translates it into works: which line items, in what order and at what point.
A summary of Law 6/2025 on the Sustainable Regulation of the Tourist Use of Housing (Ley de Ordenación Sostenible del Uso Turístico de Viviendas), as amended by Law 7/2026 (Official Gazette of the Canary Islands, BOC, of 14 August 2026), as of October 2026. The law provides for implementing regulations (reglamento de desarrollo) that may still change the technical requirements. This is not legal advice: your specific case should be confirmed by a lawyer or a gestor (administrative adviser), and by the town hall or the Cabildo (island council).
What changes with Law 6/2025
The law replaces the regime of Decree 113/2015 and changes three things that directly affect any owner who is thinking of renovating:
- Planning decides where. A new holiday rental can only be set up if the municipal land-use plan (planeamiento) expressly allows tourist use; the self-declaration (declaración responsable) has to be accompanied by a planning certificate (cédula urbanística) proving it (art. 7.7.c). The property must also be at least ten years old (art. 5.1.a).
- The authorisation expires. The self-declaration, which is submitted to the Cabildo (art. 7.1), is valid for five years in Tenerife. To renew it, you have to meet the requirements in force at that time (art. 10).
- There are new technical requirements. Floor area, bathrooms, energy efficiency, renewable hot water and access, set out in transitional provision seven (disposición transitoria séptima). These are the ones that generate the most work, and we look at them below.
If the property is in a building under the horizontal property regime (propiedad horizontal), you also have to prove that neither the deed of constitution, nor the community’s statutes, nor a resolution of the owners’ meeting prevents tourist use (art. 7.7.b).
What the law requires of the property
Until the implementing regulations are approved, the requirements of transitional provision seven apply, as worded by Law 7/2026. Translated into works:
| What the law requires | Details | Works it may involve |
|---|---|---|
| Minimum energy rating | Class F for buildings already in existence on 31 December 2007; class D for later ones | Windows with a thermal break, efficient heating and cooling, hot water production |
| Renewable hot water | From solar panels where technically feasible, or from another renewable source with emissions and consumption equal to or lower than solar thermal, backed by a technical certificate | Solar panels or an air-source heat pump, depending on the space available |
| Minimum floor area | 35 m² usable, unless one of the law’s alternatives is met | None if it is met; if not, see the alternatives |
| Bathrooms | Two complete bathrooms for more than four guest places; three for more than eight | A new bathroom, or advertising fewer places |
| Vehicle access | Up to the plot or the nearest reasonable point; if the last stretch is on foot, the listing has to say so | Usually none |
Two important nuances. First: the energy efficiency and hot water requirements don’t apply where heritage protection rules prevent them; in that case, the best rating those rules allow is required. Second: each new self-declaration is also subject to the requirements of the EU energy efficiency directive (Directive (EU) 2023/1791). Works that only just get the property to the minimum letter today may fall short at the next renewal.
The first step is to commission the energy performance certificate (certificado de eficiencia energética) before deciding anything. It tells you which letter the property is on and includes recommendations for improvement. With it you can see whether works are needed to comply and which measures raise the rating, instead of replacing the windows or the water heater blind.
If it’s under 35 m²: the alternatives
Many studios and small apartments in the south don’t reach 35 m² of usable floor area. The law accepts them if they meet the minimum habitability floor area and, in addition, at least one of these conditions (transitional provision seven, section 1):
- A private parking space, a pool, or sports or wellness facilities available to guests on the same plot.
- A private garden area: 9 m² of plot per guest place on urban land and 100 m² on rural land.
- An approved power point for charging electric vehicles on the plot.
- An A or B energy rating.
- Cooling units with a minimum energy efficiency class of A, unless there is a technical justification in the land-use plan.
- Compliance with the accessibility regulations in force when the declaration is submitted.
- Others that don’t involve works: a quality certification or EMAS, a five-year energy transition plan, a noise monitoring system, the operator being self-employed, or those set by the municipal land-use plan.
Several of the alternatives can be achieved through works, and the A or B energy rating is the one that fits best with a full renovation: the building envelope, the windows and the hot water and cooling systems all work towards the same letter. Note one detail in the wording: the exception only refers to floor area. Assume that the number of bathrooms per guest place is still required.
If your property was already registered
Properties authorised under Decree 113/2015 have two routes:
Carry on for five years and adapt
If you don’t opt for consolidation, or can’t, you carry on operating the property as before for five years from the law’s entry into force, that is, until December 2030 (if the operator isn’t the owner, at most until their contract ends). After that, either the property is authorised under the new regime, with its technical requirements, or the activity has to stop. If that period isn’t enough to offset the loss, you can ask the Cabildo for a single extension of up to five more years; the application has to be made within the first four years (transitional provision two, disposición transitoria segunda). If you plan to carry on, the renovation you do in these years is the one that has to bring the property within the new requirements.
Consolidating the tourist use
If you are both the owner and the holder of the declaration, and the property had been let without interruption for more than a year before the law, you can submit to the town hall, within a maximum of five years, the self-declaration of consolidated tourist use (declaración responsable de uso turístico consolidado) under transitional provision one (disposición transitoria primera). It doesn’t expire after five years, but the property can no longer have any residential use at all, and the right is extinguished, among other cases, if you sell it. In addition, the Cabildo checks the property’s safety, sanitary conditions, accessibility, habitability, equipment and technical condition. It’s best to submit it with the property already in good order.
Be careful with the type of works in a consolidated property. If you submit the declaration of consolidated use and the land-use plan doesn’t expressly allow tourist use in your area, the property automatically falls into the legal status of tourist consolidation (situación legal de consolidación turística). In that situation the law allows maintenance, conservation, renovation and modernisation works (mantenimiento, conservación, reforma y modernización), but tourist use is lost in the event of partial demolition, structural consolidation, rehabilitation or remodelling, or of any works that extend the building’s useful life or increase its volume or buildable floor area (transitional provision one, section 6). The law doesn’t define where a renovation ends and a rehabilitation begins: before any works of some scale, ask a lawyer or a qualified technical professional to assess it in writing.
Building permit and self-declaration: two separate procedures
It’s worth not confusing them. The building permit authorises the renovation and is applied for at the town hall: prior notification (comunicación previa), minor works (obra menor) or major works (obra mayor) depending on what you change, as we explain in the guide to building permits for renovations in Tenerife. Adding a bathroom by changing the layout, for example, is usually major works with a technical project.
The self-declaration of tourist use (declaración responsable de uso turístico) authorises the letting and is submitted to the Cabildo. It comes with its own documentation: among other things, a report signed by a competent professional, with plans of the current state and photographs, proving compliance with the applicable regulations (art. 7.7.a). Your works can be fully legalised and you still won’t be able to let the property if the second is missing. We take care of the permit and the works; your gestor handles the tourist-use declaration.
When to do the works
With no guests in the property: the law treats accommodating guests in a property with works under way, or with building materials piled up, as a serious risk (additional provision one, disposición adicional primera). In practice, that means working in your lowest-occupancy window, with a signed timeframe:
- A between-season refresh (painting, flooring, a check-over of the plumbing and electrics): three or four weeks.
- Full renovation of a 50 to 70 m² apartment: six to eight weeks.
- Windows and external doors: installation takes two or three days, but manufacturing takes four to eight weeks. They are measured and ordered before work starts.
If your property was already registered, the schedule has one more deadline: December 2030. It’s better to spread the efficiency works over one or two low seasons with time to spare than to rush them all through in the final year.
Which line items are worth it in a property you let
Prices are the same as for any renovation: €500–€1,500/m² for a full renovation, with the average for standard finishes at €700–€1,000/m². A 50 m² apartment comes to €25,000–€45,000, a complete bathroom €3,000–€8,500 and a kitchen €5,000–€14,000. What changes is the yardstick:
- First, what the law requires. Energy efficiency, renewable hot water and, if you advertise more than four guest places, the second bathroom. Without them, you can’t let the property.
- Next, whatever suffers most from guest turnover. The bathroom is the room that takes the most punishment. Porcelain tile flooring rather than wooden boards, taps with spare parts available on the island and washable paint in high-traffic areas.
- On the seafront, salt air. Window frames and hardware made for a marine environment. It’s one of the few items where we recommend not cutting costs, and it also counts towards the energy rating.
- What can wait: statement finishes. In a holiday rental, what matters more is what still looks good after three years and can be replaced without redoing half the room.
If you want to know what your particular property needs, on the site visit we check the plumbing and electrics, the layout and, if you already have it, the energy certificate, and give you a fixed-price quote with a signed timeframe. You can see how we work on holiday rental apartment renovation or get a quote directly.
Frequently asked questions
Can I register a new holiday rental in Tenerife now?
Only if your municipality’s land-use plan expressly allows tourist use for that property: the self-declaration (declaración responsable) has to be accompanied by a planning certificate (cédula urbanística) proving it (art. 7.7.c). The property must also be at least ten years old (art. 5.1.a) and meet the technical requirements. Before investing in works with holiday letting in mind, ask your town hall’s planning department whether your area allows it.
How long is the self-declaration valid for?
In Tenerife, five years from the date it is submitted (art. 10.1). To carry on, you have to submit a new one in the month before it expires, meeting the requirements in force at that time and with a favourable certificate from the town hall (art. 10.2). That’s why it pays not to cut today’s works too fine: the requirements may become stricter at each renewal.
Can I keep renting the property out while the works are going on?
No. The law treats tourist use of a property with works under way, or with building materials piled up, as a serious risk to people and property (additional provision one, section 2). The works are done with the property closed to bookings.
Do you handle the self-declaration of tourist use?
No. We handle the building permit with the town hall and carry out the renovation. The self-declaration of tourist use is submitted to the Cabildo (island council) with its own technical report, and your gestor (administrative adviser) or your lawyer handles it. They’re separate procedures and it’s worth not confusing them.
What happens if I keep renting the property out after the authorisation has expired?
It’s a serious infringement, with a fine of between €15,000 and €150,000: that’s what article 383.3 of Law 4/2017 on Land in the Canary Islands (Ley del Suelo de Canarias) establishes, a provision added by Law 6/2025 itself.