Yes, you can renovate a property in Tenerife without living on the island. What makes it workable is having a single point of contact who speaks your language, a fixed-price, itemised quote before work starts, progress updates with photos and one clear rule: no change and nothing unforeseen is carried out or invoiced without your written approval. On your side, what needs sorting out is access to the property, your dealings with the community of owners (comunidad de propietarios) and who signs the paperwork.
In many communities of owners in Puerto de la Cruz, a significant share of the owners don’t live on the island: people from mainland Spain or from abroad who use the property for a few weeks a year or let it out. For them, the question isn’t so much what renovation to do as how to keep it under control from a distance. This guide goes over what is worth preparing and how we work when the owner isn’t there.
What to sort out before work starts
- The keys. Decide who opens up the property for the visit and who holds keys during the works: someone you trust, the property administrator (administrador de fincas) or the company itself. Put it in writing, with dates.
- The community of owners. Let the administrator know before work starts. Many buildings and complexes have rules on building-work hours and on using the lift, and any work on common elements (façade, soil stacks, enclosing a terrace) needs the community’s authorisation, which is separate from the town hall’s building permit.
- The building permit. It is always in the owner’s name, but the application can be delegated. Which procedure applies to you depends on what you’re going to change: we explain it in the guide to building permits for renovations in Tenerife.
- The documents. Keep to hand a document proving that you own the property: it’s part of the usual paperwork for the permit.
- Bookings, if you let it out. If it’s a holiday rental, block out the calendar for the dates of the works. Canary Islands law treats accommodating guests while works are under way as a serious risk; we explain this in the guide to renovating a holiday rental.
How the works run when you’re not on the island
- First contact in your language. We can help you in Spanish, English, German or Russian, by phone or through the form.
- Free site visit. Someone needs to open up the property; it doesn’t have to be you.
- Fixed-price quote within 3–5 working days. With the measurements shown, the specific finishes by brand and model, the timeframe in writing and what is excluded stated explicitly. That’s what lets you compare and decide without being there.
- One contract. The works are carried out by professional Tenerife trades selected for each line item; you sign with us and we answer for the whole job. You don’t have to coordinate anyone from a distance.
- Works with progress documented in photos. Any change is approved in writing before it is made.
- Handover. Final walk-through with you and a written guarantee.
Choosing materials without seeing them in person
It’s the hardest part from a distance, and the way to reduce the risk is to decide early and in writing:
- Brand and model in the quote. If a line item just says “wall tiling” or “taps”, you don’t know what you’re going to get. Insist on the specific model: that way you can look it up and see photos and technical data sheets from home.
- First, whatever takes time to manufacture. Windows and external doors take four to eight weeks to manufacture, and in a kitchen the lead time for the units and the worktop usually sets the finish date. These are the first decisions to finalise.
- If you’re going to come over once, make it before you sign. It’s the best moment to see samples of flooring, tiles or worktops, which are more misleading in photos than anything else.
What happens if something turns up when things are opened up
In older properties it’s the most common thing: a soil stack in poor condition, damp behind the wall tiles, wiring with no earth. When it happens, we pause that line item, show it to you in photos, give you priced options and you decide. A written addendum is drawn up, and nothing you haven’t approved is carried out or invoiced. From a distance this is especially important: it’s what saves you from coming back to the island to find an invoice you weren’t expecting.
Timeframes, supplies and the time difference
- The timeframe, signed. The quote includes the timeframe in writing. If the property is let, the schedule is planned backwards from the first booking that can’t be moved.
- On an island, supply calls the shots. Ordering windows or a special floor covering late can bring the works to a halt for weeks. That’s why those orders are placed before any demolition starts, not after.
- The time difference is small. The Canary Islands are on the same time as the UK, Ireland and Portugal, one hour behind mainland Spain and Germany, Austria or Switzerland, and two or three hours behind Moscow, depending on the time of year. We answer the phone 24 hours a day, 7 days a week.
What to ask the company if you’re managing from a distance
As well as the usual questions, which we go over in the guide on how to choose a renovation company, from a distance it’s worth asking these:
- Who will be my point of contact, and in what language?
- How, and how often, will you send me updates on the progress of the works?
- How is a change or an unforeseen item approved, and what happens if I don’t reply?
- Who keeps the keys, and who is responsible for the property while the works last?
- Is the permit included in the quote? Who applies for it?
- How do the payments work? What’s reasonable is a deposit and stage payments linked to milestones that have been completed, not payments in advance.
- What guarantee do you give me, and is it in writing?
If you’d like us to look at it for your property, tell us what you need when you ask for your quote. We reply in your language and arrange the visit with you even if you’re not on the island. If you’re still doing the sums, the price calculator gives you a guide price range.
Frequently asked questions
Do I have to travel to Tenerife to renovate my property?
Not for the day-to-day. For the site visit, someone needs to open up the property – you, or someone you trust who has keys – and decisions and approvals are made in writing. If you can make a trip, the two points at which it’s most worthwhile are before you sign, to see materials, and the handover.
Which languages can you help me in?
In Spanish, English, German and Russian. We answer the phone 24 hours a day, 7 days a week: we take your details and our team gets in touch with you.
How do I know how the works are going if I’m not there?
Through progress updates documented with photos. And if a problem turns up when things are opened up, we pause that line item, show it to you in photos and give you priced options so that you can decide.
Who applies for the building permit if I live abroad?
The permit is always in the owner’s name, but the application can be delegated. In our quotes, handling the permit is included as a line item of its own, with the fees itemised.
Can the price go up while I’m away?
The quote is fixed on the basis of measured line items, and that is the price. It only changes if you decide to change something that has already been quoted for, or if a hidden problem turns up that couldn’t be seen on the visit. In both cases a written addendum is drawn up, with its price, and it isn’t carried out or invoiced until you approve it.