Office renovation in Tenerife

Renovating an office has a constraint that a home doesn’t: people carry on working inside. Most of the planning consists of deciding what’s done in phases, what’s done out of hours and in what order, so the business doesn’t stop while the works move forward.

Free site visit and quote anywhere on the island. Reply within 24 working hours, in English.

Quick answer

In an office the budget is driven less by floor area than by installations and layout. Going from an open-plan space to individual offices, or the other way round, brings with it electrics, data, air conditioning, lighting and fire detection, and those line items weigh more than the partition walls themselves.

The second variable is how the work is done without stopping the business. Working zone by zone, concentrating noisy work out of hours or temporarily relocating some of the staff changes how the works are organised and also what they cost. It’s decided with you before starting and reflected in the schedule, so nobody gets any surprises.

Guide priceAfter the site visit
Usual timeframe4–10 weeks
Visit and quoteFree, within 24 h

What this service includes

  • Survey of the current space and a layout plan. How many workstations you need, how many meeting rooms, which quiet zones and which circulation routes. The layout is the decision that shapes everything else most.
  • Partitions, glazed screens and false ceilings. With demountable solutions when it helps to be able to reconfigure the space later without new building work.
  • Electrical and data installation. Workstations with their power and network connections, cable containment, a rack and enough spare capacity to grow, which is what almost always falls short.
  • Lighting designed for working. Suitable light levels for each zone, with attention to glare on screens, the most common failing in newly renovated offices.
  • Air conditioning and acoustics. Air distribution to match the new layout and acoustic treatment where needed, because an open space with no sound absorption ends up being unworkable.
  • Finishes and signage. Flooring, painting, interior joinery and any branding elements you want to incorporate.
  • Phased planning and out-of-hours work. With an agreed and communicated schedule, so each week you know which zone is affected.

What is NOT included

This list matters as much as the first one, and hardly anyone publishes it. Any of these items can be added to the quote: what we don’t want is for them to turn up halfway through the job as a surprise.

  • Office furniture, chairs and decorative items, unless expressly quoted as a line item.
  • IT equipment, network electronics and system configuration: the infrastructure is left ready, but the active equipment is separate.
  • The activity licence (licencia de actividad) or changes to it when the renovation changes the use of the premises, which is a procedure of its own with its own technical documentation.
  • Works on communal parts of the building that need the agreement of the community of owners.
  • Bringing fire safety up to regulations when the renovation requires it to be reviewed as a whole, which is assessed with the qualified professional and quoted separately.
  • Moving and storing existing furniture during the phases of work, unless specifically hired.
Transparent pricing

How much it costs in Tenerife

We don’t publish a price per square metre for offices because the real range is too wide for the figure to mean anything: a change of finishes and a complete reconfiguration with new installations are nothing alike. This is what’s assessed.

  1. The floor area and the number of workstations, which determine the load on the installations. A 200 m² space with fifteen workstations and another with fifty have very different quotes.
  2. The scope of the layout changes: whether the existing layout is kept, spaces are opened up, or new offices and rooms are created with everything that brings with it.
  3. The installations, usually the heaviest section: electrics, data, air conditioning, lighting and fire protection depending on the use.
  4. The level of finish, from a functional, understated solution to an office with a strong brand image, which is where you can go up or down most without compromising function.
  5. The constraint of working around the business. Works in phases, at night or at weekends cost differently from works in empty premises, and we’d rather tell you that from the start.
  6. The building logistics: access times, lift use, getting materials up and rubble down. In an office building in the city centre this weighs more than you’d think.

Any estimate beforehand is a guide, subject to a site visit and to the layout being defined. In the Canary Islands IGIC, the local indirect tax, is charged instead of VAT, and it always appears separately on the quote.

Timeframes

4–10 weeks

A medium-sized office renovation usually takes between one and two and a half months if the premises are empty. Working with the business running makes it longer, because progress is zone by zone and some tasks can only be done out of hours. The other factor is the delivery times for glazed screens, joinery or specialist lighting, which are best ordered in advance. If the business has a quiet season, planning the works for that window gives the best result.

The process

How we work

We manage the works, and they are carried out by professional tradespeople from the island, chosen by us for each line item. We don’t have a crew on the payroll and would rather say so up front: you sign one contract, speak to one person and we answer for the whole job. We explain it plainly in about us.

  1. Site visitWe come to the property, measure up and check the plumbing and electrics. Free.
  2. Fixed-price quoteWithin 3–5 days: every line item with price, finishes and timeframe.
  3. Permit and scheduleWe handle the permit and line up the trades with no dead time.
  4. Supervised worksProgress updates with photos. Any change is approved before it is made.
  5. HandoverFinal walk-through with you and a closed snagging list.
Renovated meeting room with a glass partition and acoustic panels

Renovating without stopping the business

It’s the most frequent request and the part of the job that most has to be tailored to each case. These are the strategies we usually combine, depending on the situation.

  • Split the premises into zones and renovate one while the rest keeps working, with screens that contain the dust and noise.
  • Concentrate noisy work, such as breaking out or drilling, outside customer-facing hours or meeting times.
  • Temporarily move part of the team into the finished zone, to free up the next one completely.
  • Bring forward anything that can be prefabricated off site, such as glazed screens or joinery, so installation on the premises is quick.
  • Name one contact person on your side and one on ours, with a fixed weekly update on which zone is affected.

What goes wrong most often in a renovated office

Having seen offices after they’re finished, the problems repeat themselves and almost all of them come down to planning, not execution. The most common is acoustics: the space is opened up to encourage collaboration and nobody planned for sound absorption, so two weeks later people are working in headphones and taking calls in the corridor.

The second is a lack of electrical and data provision. Just enough sockets are installed for the workstations on opening day, and within a year there’s nowhere to plug in. Leaving extra points during the works costs very little; adding them later means lifting the floor or ceiling again. The third is badly positioned lighting, which causes glare on screens and forces blinds to stay down all day on an island where natural light is an asset.

The whole island

Where we offer this service

Across the whole island of Tenerife. Our office is in Arona, and we work in all four areas: the metropolitan area, the north, the south and the Güímar Valley. The site visit is free in every municipality.

Common questions

Frequently asked questions

The questions we are asked most often on site visits. If yours is not here, ask us directly.

Can we keep working during the works?

In most cases yes, working zone by zone and moving noisy work outside office hours. There are specific moments, such as cutting the power or working in the entrance area, when there’s no choice but to stop for a few hours. That’s planned weeks in advance and you’re told about it, not improvised.

What permit does an office renovation need?

It depends on whether you’re changing the use or just the interior. A renovation that doesn’t touch the structure or the facade is usually handled as minor works (obra menor) or a prior notification (comunicación previa). If you change the use of the premises, the occupancy or the evacuation conditions, the activity licence and its technical documentation come into play. We check with your town hall before moving anything.

Glazed partitions or built walls?

Glazed partitions go up quickly, let the light through and can be taken down and reconfigured, which is why they’re the default option when the space is going to change. Built walls give better sound insulation and are the choice for meeting rooms or offices where confidentiality matters. The usual approach is to combine both depending on the zone.

How is the data installation organised?

The rack is positioned first and cabling runs from there to each workstation, usually through the false ceiling or a raised floor. The advice is always to leave more points than you need today: the added cost during the works is minimal compared with opening up later. It’s also worth planning the wifi access points with their power supply, rather than improvising them with visible cables.

Do you work out of hours or at weekends?

Yes, when the business requires it. It’s the usual way to get the most disruptive work done without stopping the business. It costs differently from normal hours and appears as such on the quote, not hidden in other line items.

Quote

Tell us what you need

We call you within 24 working hours, in English, to arrange the visit. Free and with no commitment.

  • Free site visit anywhere on the island
  • Fixed-price quote, itemised line by line
  • Your details are not passed on to third parties

Prefer to talk? +34 822 263 441

We reply within 24 working hours, in English. No cost, no commitment and your details are never passed on to a list of companies: you hear back from the person who will manage your project.

Shall we put a price on your renovation?

Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.