Energy efficiency retrofits for buildings in Tenerife
An energy efficiency retrofit isn’t about putting up solar panels: it means first reducing what the building loses, and only then generating energy. Doing it the other way round is the most expensive mistake, and the most common one.
Free site visit and quote anywhere on the island. Reply within 24 working hours, in English.
In Tenerife the goal isn’t usually heating, but preventing overheating in the south and controlling damp in the north. That completely changes the priorities compared with the Spanish mainland.
The order that works best is almost always: windows and glazing first, then the building envelope if the facade needs it, and energy generation – solar self-consumption, air-source heat pumps – last. Investing in generation before you stop the losses means paying twice.
What this service includes
- Assessment of how the home or building actually performs: orientation, openings, envelope, ventilation and consumption.
- A prioritised proposal of measures, each with its cost and expected effect, so you can decide the order and the pace.
- Envelope improvements: external wall insulation (SATE), roof insulation and treating thermal bridges.
- Replacement windows and doors with glazing suited to each orientation.
- Efficient systems: solar PV for self-consumption, air-source heat pumps or high-efficiency heating and cooling where appropriate.
- Technical documents for whatever grant programmes are open at the time of the works.
What is NOT included
This list matters as much as the first one, and hardly anyone publishes it. Any of these items can be added to the quote: what we don’t want is for them to turn up halfway through the job as a surprise.
- Managing and following up the grant. We prepare the technical documents; the application is submitted by the owner or their administrator.
- Any guarantee that a grant will be awarded, or that a programme will still be open when your works come round.
- Energy performance certificate as a standalone service: it’s issued by a qualified professional and is included only when the works require it.
- Savings commitments in euros without first studying your actual consumption.
- Structural repairs to the building, which are a different job.
How much it costs in Tenerife
It depends entirely on which measures are included and in what order. What matters isn’t the total price but the cost of each measure against what it delivers:
- Windows and doors: from €380/m² of opening with a thermal break. Usually the measure with the best ratio of cost to comfort you can feel.
- Envelope / external wall insulation: calculated on the actual facade area and heavily dependent on the preparatory repairs. See facade restoration.
- Solar self-consumption: sized to your actual consumption, not to the roof area. See solar panels.
- Roof insulation: often the cheapest measure, and the one with the biggest effect on the top floor of a building in the south.
Each measure is quoted separately so you can carry them out in phases. Prices exclude tax: the Canary Islands charge IGIC (their own indirect tax) instead of VAT.
Timeframes
In phases
It’s rarely all done at once, and it almost never makes sense to. Replacing windows takes weeks, a facade with external insulation takes months, and a solar installation depends on paperwork we don’t control. The usual and most sensible approach is to plan the measures in two or three phases spread over time.
How we work
We manage the works, and they are carried out by professional tradespeople from the island, chosen by us for each line item. We don’t have a crew on the payroll and would rather say so up front: you sign one contract, speak to one person and we answer for the whole job. We explain it plainly in about us.
- Site visitWe come to the property, measure up and check the plumbing and electrics. Free.
- Fixed-price quoteWithin 3–5 days: every line item with price, finishes and timeframe.
- Permit and scheduleWe handle the permit and line up the trades with no dead time.
- Supervised worksProgress updates with photos. Any change is approved before it is made.
- HandoverFinal walk-through with you and a closed snagging list.
Why the priorities are different here
Energy efficiency regulations and advice are written with continental climates in mind, where the problem is heating. In Tenerife, that’s not where the money goes. In the south, consumption shoots up because of cooling and the overheating of exposed facades, which stops rooms cooling down even at night. In the northern midlands (the mid-altitude slopes), the problem is damp and condensation, which damage the home and affect how healthy it is to live in more than they affect the bill.
The practical upshot is that here, solar control – the right glazing, shading for windows, roof insulation on the top floor – usually delivers more than solutions designed to retain heat. And in the north, improving ventilation and reducing condensation can solve a problem people have spent years tackling with anti-mould paint.
About renovation grants
There are grant programmes for energy efficiency retrofits, with different funding rounds and requirements. We deliberately don’t publish amounts, percentages or application deadlines here: that information goes out of date, and an outdated page about grants could lead you to make a decision based on facts that are no longer true.
What we do is check what’s available at the time of your works and tell you clearly whether your case qualifies or not. If it doesn’t, we tell you just the same: the works have to pay off with or without a grant.
Where we offer this service
Across the whole island of Tenerife. Our office is in Arona, and we work in all four areas: the metropolitan area, the north, the south and the Güímar Valley. The site visit is free in every municipality.
Frequently asked questions
The questions we are asked most often on site visits. If yours is not here, ask us directly.
Where do I start with an energy efficiency retrofit of my home?
In most cases on this island, with the windows and glazing, especially on south- and west-facing sides. It’s the measure you notice most in comfort from day one, and the one that involves the least work. Then, if the facade needs it, the envelope. And generation – solar panels, heat pumps – last, once you’ve stopped the losses.
Are there grants available right now?
They change with each funding round, so we don’t publish them here to avoid giving you out-of-date information. We check at the time of your works and tell you what’s available, whether you qualify and what technical documents are needed. If you don’t qualify, we tell you that too.
Is insulation any use if it isn’t cold here?
It is, but for the opposite reason to the one usually given. In the south, insulating the roof and exposed facades reduces overheating and with it the cost of cooling, which is where the energy really goes here. In the north, it also moves the dew point and reduces the indoor condensation that causes recurring mould.
Can it be done in phases?
Yes, and that’s what we recommend in most cases. We give you the prioritised proposal with the cost and expected effect of each measure, and you decide the pace. The one thing to avoid phasing badly is anything that shares scaffolding: if you’re going to work on the facade and the windows, doing them together saves putting the scaffolding up twice.
Related services
Windows and doors
Window replacement and installation in Tenerife from €380/m² with a thermal break: uPVC, aluminium or timber chosen for salt air. Free visit, in English.
View the service
Solar panels and self-consumption
Solar panel installation in Tenerife: a study of your real consumption, a system sized to it without oversizing, and mounting built for salt air and wind.
View the service
Facade restoration and external wall insulation
Facade restoration in Tenerife: repairs, damp, external wall insulation and painting. Survey first, then a fixed-price itemised quote for communities.
View the service
Tell us what you need
We call you within 24 working hours, in English, to arrange the visit. Free and with no commitment.
- Free site visit anywhere on the island
- Fixed-price quote, itemised line by line
- Your details are not passed on to third parties
Prefer to talk? +34 822 263 441
Shall we put a price on your renovation?
Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.