Which building permit do I need?
It’s the question that holds up renovations most, and the one worst explained online. Answer five questions about what you’re going to change and we’ll tell you which procedure applies to you, what documents are usually requested and what it means for your timeline.
—
What it involves
This is general guidance, not a planning report. Each town hall has its own bylaw and the final classification is made by the council’s technical officer. We check it on your town hall’s online portal before giving you a start date.
The three procedures, explained
This is the table behind the checker. The exact names change from one town hall to another, but the underlying logic is the same across the island: the more the works affect the structure, the floor area or what can be seen from the street, the more demanding the procedure.
Prior notification (comunicación previa)
You’re only touching finishes: wall tiling, flooring, sanitaryware, paint, furniture or interior joinery. No structure, no layout, no exterior.
- A notification to the town hall with a description of the work and its quote.
- In quite a few municipalities it lets you start as soon as you submit it, without waiting for a formal decision.
- The rubble paperwork still applies.
Watch out: Watch out for a common trap: if, once you start chipping away, it turns out a partition wall has to be touched or some plumbing or wiring redone, the case changes and so does the procedure. It’s best to check before you start, not after.
Minor works (obra menor)
You’re changing things inside without touching the structure, the floor area or the outside appearance. It’s the most common case in a home renovation.
- An application with a description of the works, an itemised quote and, depending on the municipality, plans of the current and the renovated layout.
- Some town halls only require a self-declaration (declaración responsable); others require a formal decision. It depends on the specific bylaw.
- Paperwork showing the rubble goes to an authorised tip.
- A report signed by a qualified professional may be requested if the layout changes.
Watch out: Even if the procedure is lighter, it isn’t optional. Starting without it exposes you to the works being stopped and to enforcement proceedings, and complicates any future sale.
Major works (obra mayor)
Your works affect the structure, the built floor area or the outside appearance of the building. That puts them beyond what can be dealt with through a simplified procedure.
- A project drawn up and signed by a qualified professional (an architect or, depending on the case, a technical architect).
- Site supervision by an architect or engineer (dirección facultativa) while the works are carried out.
- A health and safety study, and the paperwork for managing the construction waste.
- A formal decision from the town hall: submitting the application does not, by itself, allow you to start.
Watch out: It’s the longest of the three procedures and the one to get going before anything else. If you have a move-in date, count the administrative timeline backwards from it.
| What you’re going to do | Usual procedure |
|---|---|
| Painting, replacing sanitaryware, wall tiling or flooring | Prior notification |
| Renewing the plumbing or electrics without touching partition walls | Prior notification or minor works |
| Changing the layout with non-load-bearing partitions | Minor works |
| Replacing windows while keeping the opening, colour and material | Minor works |
| Making an opening in a load-bearing wall | Major works with a project |
| Altering the facade, roof or outside appearance | Major works with a project |
| Enclosing a terrace or adding floor space | Major works with a project |
| Changing commercial premises into a home | Major works with a project and a change-of-use permit |
Municipalities in Tenerife with a protected historic centre
In these municipalities, any work visible from the street is subject to additional conditions. It isn’t an insurmountable obstacle: it’s something to build into the timeline from the start rather than discovering it once the scaffolding is already up.
- San Cristóbal de La Laguna. The historic ensemble of San Cristóbal de La Laguna is a World Heritage Site. Any work visible from the street — facade, windows and doors, roof, metalwork — is subject to conditions on material, colour and detailing, and usually requires an additional report.
- La Orotava. La Orotava has a protected historic centre, with its own criteria on facades, joinery and building volume around the old town.
- Icod de los Vinos. Icod de los Vinos has a protected historic centre around the Drago dragon tree and the historic quarter, with conditions on anything visible from the street.
- Santa Cruz de Tenerife. Santa Cruz has areas with environmental protection and listed buildings, especially around the historic centre. It’s worth checking whether your building is listed before drawing up any plans.
- Puerto de la Cruz. The old town of Puerto de la Cruz is protected, with listed buildings around the fishing harbour and the historic quarter.
Other municipalities in the north, such as Garachico, Los Silos or San Juan de la Rambla, also have protected historic areas. If your home is in an old town centre, mention it at the visit and we’ll check before planning anything.
Why we don’t publish each town hall’s fees
Because they change, and an out-of-date fee on a web page is worse than giving none at all: it would have you planning with a false number. Municipal tax bylaws are reviewed periodically, and each of the 31 municipalities has its own. What we can tell you is that, across the whole quote, permits and professional fees account for between 3% and 6%, and that this line item is shown separately in any properly prepared quote.
When your job comes up, we check it on your town hall’s online portal and give it to you in writing, with the date we checked.
You’ll find the topic covered in full in the guide to building permits for renovations in Tenerife. And if you’re still working out the numbers, take a look at the cost calculator.
Frequently asked questions
The questions we are asked most often on site visits. If yours is not here, ask us directly.
What permit do I need to renovate a bathroom or a kitchen?
If you’re only changing the wall tiles, sanitaryware, units and taps without touching partition walls or the soil stack, a prior notification (comunicación previa) is usually enough. If you also move partition walls or redo the plumbing or wiring, it becomes minor works (obra menor). Each town hall has its own bylaw, so we check it on the council’s online portal (sede electrónica) before giving you a start date.
When do I need major works (obra mayor) with a project?
When you touch the structure (load-bearing walls, beams, pillars, floor slabs), when you add floor space or change the use, or when you alter the facade, the roof or the outside appearance. In those cases you need a technical project and supervision by a qualified professional, and you have to wait for a formal decision from the town hall.
Can I start the works without a permit?
It’s not advisable, and for major works it simply isn’t allowed. Starting without the paperwork exposes you to the works being stopped and to disciplinary proceedings, and leaves an irregularity that comes to light years later when you sell or apply for a mortgage. The cost of the procedure is always lower than the cost of putting things right afterwards.
How much does the permit cost and how long does it take?
We don’t publish amounts or timescales in days, and that’s deliberate: fees and timings vary with each municipal bylaw, and an out-of-date figure on a website is worse than no figure at all. We check it on your town hall’s online portal at the time of your works. In the quote, permits and professional fees account for between 3% and 6% of the total.
What changes if my home is in a historic centre?
Quite a lot. In La Laguna, La Orotava, Icod, Garachico and other protected areas, everything visible from the street — facade, windows and doors, roof, metalwork — is subject to conditions on material, colour and detailing, and usually requires an additional report on top of the municipal permit. It doesn’t make the works impossible; it makes them slower and more technical.
Do you handle the permit?
Yes, it’s part of the service. We prepare the documents and submit them, and when the works require a project, it is signed by a qualified professional. What we don’t do is promise a decision date: that timeline depends on the town hall and we don’t control it.
Shall we put a price on your renovation?
Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.