Renovations in Santiago del Teide
Los Gigantes is built on a slope that falls towards the cliffs, with stepped buildings, ramped streets and entrances reached by stairs. It’s probably the place in Tenerife where building logistics weigh most on the final price. Together with Puerto de Santiago and Playa de la Arena it makes up a stock of holiday apartments from the seventies and eighties that is already on its second or third renovation.
Most requested renovation services in Santiago del Teide
How renovations are done in Santiago del Teide
When the lorry can’t get there: the slope as a line item in the quote
In much of Los Gigantes the usual renovation scene, where the lorry parks outside the door and unloads in twenty minutes, doesn’t exist. There are streets with very steep gradients, stretches where a large vehicle can’t manoeuvre, scarce parking and buildings whose pedestrian access climbs several flights of stairs from the nearest place you can stop. In practice, materials go up in small batches and rubble comes down the same way, by hand or by wheelbarrow, and putting a skip in front of the building isn’t always possible: sometimes you have to negotiate a different spot and take on the extra carrying. All of that is labour time, and labour time is money.
That’s why, in this municipality, the first visit isn’t about tiles. It’s about measuring the real route from where the van stops to the door, counting steps, checking whether the lift takes a sack or a bath, seeing whether a facade hoist would fit and finding out whether a permit to occupy the public highway (ocupación de vía pública) is needed. With that information you can give a price that holds to the end; without it, any quote is a gamble. It also changes the choice of materials: on a fourth floor with no vehicle access, a lightweight partition or a finish that avoids chipping back to the substrate can save more in logistics than it costs extra in materials. We reason that decision through with you; we don’t take it on our own.
Cliffs, wind and a full building: the rest of the equation
The cliff-top seafront combines two kinds of attack at once. Salt air attacks railings, metalwork, fittings and the reinforcement in slab edges and overhangs, which is where the stains and spalling so familiar on this area’s coastal buildings appear. And the wind, speeding up as it hits the cliff face, drives rain sideways against facades and windows and creates suction on parapets and cornices. A renovation that only looks inwards and doesn’t sort out the envelope visibly deteriorates within a few years. In facade refurbishment here, painting isn’t enough: you have to check the state of the concrete at the slab edges and treat whatever is corroded before covering anything up.
On top of that, Puerto de Santiago and Los Gigantes live off holiday rentals practically all year, so you hardly ever renovate in an empty building. You have to work to agreed noise hours, protect shared walkways and coordinate with the community or the administrator when the most disruptive tasks are done. In Tamaimo and the main town higher up, the scene is different: village houses, stony volcanic ground that complicates any excavation, and access that, while narrow, gives much more leeway than the coast. We manage and coordinate; the work is carried out by trades from the area whom we hire for each job.
Building permits in Santiago del Teide
- Prior notification
- Minor works
- Major works with project
Interior renovation with no structural or exterior impact is usually processed through Santiago del Teide town hall’s lightest route, a prior notification (comunicación previa) or self-declaration (declaración responsable). Major works (obra mayor), with a project and site supervision by an architect or engineer (dirección facultativa), come in when there’s structure, an extension, a change of use or a change to the building’s outside appearance. In this municipality there’s a very common case worth identifying early: work on the facade or common elements of an apartment building, which isn’t a private renovation however much a single owner is pushing it, and which normally needs the agreement of the community of owners as well as the council procedure.
It’s also common to need authorisation to occupy the public highway with a skip, scaffolding or a mobile elevating platform, which on streets this narrow and steep stops being a detail and becomes a condition for being able to start. It’s applied for at the town hall and best requested with time to spare. We don’t publish fee amounts or specific timeframes because they vary and because we’re not the ones who decide them; what we do is ask before committing to a start date, and tell you if the answer changes the plan.
We don’t publish fee amounts or specific administrative timeframes, because they change with each bylaw and an out-of-date figure is worse than none. We check them on the town hall’s online portal (sede electrónica) before giving you a start date. You will find the general framework in the guide to building permits in Tenerife.
Parts of Santiago del Teide where we work
We work in Los Gigantes, Puerto de Santiago and Playa de la Arena on the coast, and in Tamaimo, Santiago del Teide town, Valle de Arriba, Arguayo and Las Manchas higher up. Down below, the holiday apartment on a slope with salt problems dominates; up above, the detached village house on volcanic ground.
Frequently asked questions about renovating in Santiago del Teide
The questions we are asked most often on site visits. If yours is not here, ask us directly.
Can an apartment in Los Gigantes be renovated without lorry access?
Yes, it’s done all the time, but it has to be quoted for what it is. Materials go up in batches and rubble comes down the same way, which adds hours and, depending on the case, a facade hoist or a skip placed further away. We measure the real route and the steps on the first visit and show it as a visible line item, not as an extra that turns up halfway through the job.
The facade has rust stains and pieces falling off. Is painting enough?
No. Those stains are usually corrosion of the reinforcement at slab edges and overhangs, very typical of a salt-exposed seafront. Painting over them hides the symptom while the problem keeps advancing underneath. Proper facade refurbishment means repairing the affected concrete, treating the steel and making good before applying the finish. If the building has a community of owners, it also has to go through the community.
I let the apartment seasonally. When is the best time to fit the works in?
When you can give us one continuous block of days, even a short one, rather than odd days here and there. In an occupied building noisy work has set hours, so stretching the job out in bits multiplies the weeks without saving money. Tell us which dates you have free before we quote and we’ll organise the line items in that order.
Neighbouring municipalities
We also work in Guía de Isora, El Tanque and Buenavista del Norte, and in the rest of the south.
Renovations in Guía de Isora
View the municipality
South
All municipalities in the area
View the areaPage last reviewed: 14 August 2026.
See what yours costs in Santiago del Teide
Choose what you want to do, the finishes and the style, and the planner gives you the guide price, the timeline and the permit. No details needed.
Plan my renovationStarts with your municipality already selected
Renovating in Santiago del Teide?
Tell us what you want to do. Free site visit and a fixed-price quote, itemised line by line.
- Free site visit anywhere on the island
- Fixed-price quote, itemised line by line
- Your details are not passed on to third parties
Prefer to talk? +34 822 263 441
Shall we put a price on your renovation?
Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.