Skip to content
Reforma en Tenerife
Newly laid large-format porcelain tile floor in a bright open-plan space (illustrative rendering)
Service · Flooring

Flooring installation in Tenerife

Changing the floor transforms a home more than almost any other job at the same price. In Tenerife, porcelain tile ranges from €40 to €90 per square metre with laying included. The difference between one end and the other lies in the tile format, the quality of the tile and whether what’s there has to be lifted.

Free site visit and quote anywhere on the island. Reply within 24 working hours, in English.

Guide price in Tenerife

Laying porcelain floor tiles in Tenerife usually costs between €40 and €90 per square metre, including materials and laying. Within that range, what weighs most is the tile format (large tiles need flatter substrates and more hands to lay them), the quality of the porcelain and the laying pattern, because a herringbone or a bespoke layout doesn’t cost the same as a straight lay.

On top of that, where applicable, comes lifting the old floor and removing the rubble, a serious line item that many quotes leave out to look cheaper. In some cases the new floor can go on top and save you that, but not always: it depends on the height of the doors, the condition of the substrate and the resulting floor level.

Guide price€40–€90/m²
Usual timeframe3–7 days
Visit and quoteFree, within 24 h

What this service includes

  • Checking the substrate. We see whether it’s level, whether any areas sound hollow and whether it can take the new flooring. This is where the decision to lift or lay on top comes from, and it’s the one that changes the quote most.
  • Lifting and removing the old floor if needed. Including rubble disposal, which in an upper-floor home is not trivial.
  • Preparation and levelling. Self-levelling compound or a levelling screed when the substrate needs it. Without a properly flat surface, large tiles end up with raised edges and every lip shows.
  • Laying with the right materials. Adhesive suited to the format and the substrate, back-buttering on large tiles and respecting the perimeter joints, which is what stops the floor from lifting over time.
  • Skirting and finishing details. Junctions with door frames, thresholds and transitions between rooms, the details that give away a well or badly finished job.
  • Grouting and final clean. With the joint width agreed beforehand, not improvised on site.

What is NOT included

This list matters as much as the first one, and hardly anyone publishes it. Any of these items can be added to the quote: what we don’t want is for them to turn up halfway through the job as a surprise.

  • Removing and refitting kitchens, fitted wardrobes or fixed furniture when the floor goes underneath, which is priced separately.
  • Trimming doors when the new flooring raises the floor level, unless expressly included as a carpentry line item.
  • Structural repair of the floor slab if problems appear when the old floor is lifted, which needs a separate technical assessment.
  • Installing underfloor heating or any system beneath the flooring, which is a different job with its own quote.
  • Moving and storing furniture during the works, unless hired as a service.
  • Touch-up painting of the walls after the skirting is changed, which is usually needed and is quoted as a finishing item.
Transparent pricing

How much it costs in Tenerife

This is the range we work with for the most common flooring on the island. It’s measured on the actual floor area, adding the wastage that comes with the layout and the chosen format.

Guide prices: Flooring installation in Tenerife
ItemGuide priceNote
Porcelain floor tiles laid, materials and labour €40–€90/m² Rises with large formats, tile quality and laying patterns other than straight.

A guide, subject to a site visit. Lifting the old floor, rubble removal and levelling the substrate go in as separate line items when they’re needed. In the Canary Islands IGIC, the local indirect tax, is charged instead of VAT, shown separately on the quote.

Timeframes

3–7 days

In an average home, changing the floor takes between three days and a week, depending on the area and on whether the previous floor has to be lifted. The times that can’t be rushed are for the adhesive and grout to set before the floor can be walked on normally, and for a levelling layer to dry if one is needed. If it’s laid over the existing floor, the job goes much faster because the demolition and rubble removal drop out.

The process

How we work

We manage the works, and they are carried out by professional tradespeople from the island, chosen by us for each line item. We don’t have a crew on the payroll and would rather say so up front: you sign one contract, speak to one person and we answer for the whole job. We explain it plainly in about us.

  1. Site visitWe come to the property, measure up and check the plumbing and electrics. Free.
  2. Fixed-price quoteWithin 3–5 days: every line item with price, finishes and timeframe.
  3. Permit and scheduleWe handle the permit and line up the trades with no dead time.
  4. Supervised worksProgress updates with photos. Any change is approved before it is made.
  5. HandoverFinal walk-through with you and a closed snagging list.
Laying large-format porcelain tiles with levelling clips on the adhesive

Which flooring to choose in Tenerife

The choice depends on the room, how much light it gets and how close you are to the sea. These are the options seen most on the island, with the pros and cons of each.

  • Porcelain tile: the most balanced option for almost the whole home. It’s hard-wearing, cleans without fuss and there are very convincing wood and stone effects. Outdoors you have to insist on a non-slip rating.
  • Laminate: cheap and quick to install, but sensitive to water and to humidity in the air. In damp areas of the north and in ground-floor apartments, think twice.
  • Vinyl: copes well with water, feels warm underfoot and can be laid over the existing floor with very little thickness. It’s the practical option when you can’t raise the floor level.
  • Natural wood: beautiful, and it needs maintenance. Near the sea and with high humidity it needs constant care, so it’s worth knowing what you’re getting into beforehand.
  • Microcement: seamless and joint-free, very attractive visually, but highly dependent on who applies it and on the state of the substrate. It isn’t the cheap option it’s sometimes sold as.

Before changing just the floor, look at the whole renovation

Changing the flooring means emptying the home, protecting everything and living with the works for a few days. You pay for that disruption either way, whether or not you also rewire, redo a bathroom or knock down a partition wall. So if you have something else in mind for the next two or three years, it almost always works out better to do it all together.

The order matters: installations and building work first, then the floor, and painting last. Laying a new floor and cutting chases the following month is the sequence that causes the most grief. If you’re not sure, we’ll talk it through before quoting for the floor alone.

The whole island

Where we offer this service

Across the whole island of Tenerife. Our office is in Arona, and we work in all four areas: the metropolitan area, the north, the south and the Güímar Valley. The site visit is free in every municipality.

Common questions

Frequently asked questions

The questions we are asked most often on site visits. If yours is not here, ask us directly.

Can I lay the new floor over the one I have?

Often, yes, and it saves the demolition and the rubble, which is no small thing. The conditions are that the current floor is well bonded and doesn’t sound hollow, that the slab can take the weight and that the new level doesn’t leave doors catching or an odd step at the entrance. We check it on the site visit and tell you clearly whether it’s a good idea in your case.

Do the furniture and the kitchen have to come out?

The home has to be cleared, yes. The kitchen and fitted wardrobes are another story: if the floor is going to run underneath them, they have to be dismantled, and that’s a separate line item. Often the choice is to lay up to the front of the units, which is cheaper, although it limits you if you change the kitchen in future and the dimensions don’t match.

What joint should be left between tiles?

It depends on the format and the material, and there’s no single answer. What is true is that a zero joint practically doesn’t exist: tiles need a minimal joint to absorb movement, and forcing them to butt tight together is what later causes chipped edges. It’s agreed before starting and written into the quote.

And the perimeter joint, is it really needed?

Yes, and it’s one of the things most often skipped. Flooring expands, and if it’s pressed tight against the walls all the way round, that expansion has nowhere to go and the floor ends up lifting. The joint is hidden under the skirting, so you don’t see it, but it’s what prevents the problem.

Can you lay material I buy myself?

Yes, we can quote for laying only. Bear two things in mind: wastage and breakages during handling are your responsibility, and if the material has a manufacturing defect, the claim is yours to make with the supplier. We’ll help you work out the quantity so you don’t run short halfway through, which is the classic problem.

Plan your renovation

See what yours costs in 3 minutes

Choose what you want to do, the finishes and the style, and the planner gives you the guide price, the timeline and the permit. No details needed.

Plan my renovation

Starts with the flooring already selected

Quote

Tell us what you need

We call you within 24 working hours, in English, to arrange the visit. Free and with no commitment.

  • Free site visit anywhere on the island
  • Fixed-price quote, itemised line by line
  • Your details are not passed on to third parties

Prefer to talk? +34 822 263 441

We reply within 24 working hours, in English. No cost, no commitment and your details are never passed on to a list of companies: you hear back from the person who will manage your project.

Shall we put a price on your renovation?

Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.