Skip to content
Reforma en Tenerife
Renovated bathroom with a floor-level shower, glass screen and wall-hung oak vanity unit (illustrative rendering)
Santa Cruz de Tenerife

Bathroom renovation in Santa Cruz de Tenerife

A bathroom in a flat in the capital has three constraints a house doesn’t: the soil stack is shared, many bathrooms are internal with no window, and the work is done in a building where people live. All three can be solved, but they need explaining up front.

Narrow staircase and old lift in a 1970s building in Santa Cruz de Tenerife

The soil stack sets how far you can move things

In a flat, the main soil stack is a common element: it isn’t yours even though it runs through your wall. You can move the toilet within certain margins while keeping the fall needed to reach the connection point, but taking it to the other end of the bathroom isn’t always possible, and taking it to another room almost never is.

It’s worth knowing this before drawing your dream layout. On the visit we measure the possible route and tell you which arrangement can really be built, which often isn’t the one in the inspiration photos.

The internal bathroom and the mould that always comes back

Many flats in the capital have at least one internal bathroom with no window, ventilated through a duct. In many cases the original extractor fan is undersized or the duct hasn’t been maintained for years, and that, not the paint, is the real cause of the mould that comes back every winter.

Replacing the extractor with a correctly sized one and checking the duct is a cheap fix for a problem people have spent years attacking with anti-mould paint. If you’re renovating the bathroom, that’s the moment to do it properly.

Works in an occupied building

  • Working hours set to the community’s rules, and kept to.
  • Advance notice to the neighbours of the breaking-out days, which are the noisy ones.
  • Protection of shared walkways and daily cleaning of the entrance and stairs.
  • Planned rubble removal, with a skip permit when the street requires one.
  • Water cuts coordinated with the community if they affect the riser.
Common questions

Frequently asked questions

The questions we are asked most often on site visits. If yours is not here, ask us directly.

How much does it cost to renovate a bathroom in Santa Cruz?

Between €3,000 and €8,500 for a complete bathroom of 3–5 m². The lower end is a small bathroom with mid-range finishes; the upper end, a larger one or one with better materials. The final price depends mainly on the state of the installations that turn up once the old tiling comes off.

Can I move the toilet to another wall?

Within certain margins, yes, keeping the fall to the soil stack, which is a common element. How much leeway you have depends on your particular bathroom: we measure it on the visit and tell you before you settle on a layout that then can’t be built.

How many days will I be without a bathroom?

A complete renovation takes two or three weeks, but you’ll only be without a usable bathroom on a few specific days, which we tell you about in advance. If there’s a second toilet in the home, we order the work so that one is always in use.

Do I have to tell the community?

It’s advisable, and in many buildings it’s compulsory under the internal rules. If the work involves shutting off the water riser or affects the soil stack, coordinating it is essential. We take care of talking to the administrator or the community’s president to agree it.

Plan your renovation

See what yours costs in Santa Cruz de Tenerife

Choose what you want to do, the finishes and the style, and the planner gives you the guide price, the timeline and the permit. No details needed.

Plan my renovation

Starts with the bathroom already selected

Quote

Tell us about your project

Free site visit in Santa Cruz de Tenerife and a fixed-price quote, itemised line by line.

  • Free site visit anywhere on the island
  • Fixed-price quote, itemised line by line
  • Your details are not passed on to third parties

Prefer to talk? +34 822 263 441

We reply within 24 working hours, in English. No cost, no commitment and your details are never passed on to a list of companies: you hear back from the person who will manage your project.

Shall we put a price on your renovation?

Tell us what you want to do and where on the island. We call you, visit the property and send you a fixed-price quote, itemised line by line. No cost and no commitment.